After you create a report package, you may want to run it to see that it works. On
the Package page, you can click the
Run Package button to run a
selected report package.
Important: When you run a report package manually to
test it, you send the output results to all of the destinations that have been enabled
in the package. If you do not want the output results to be sent to all of the specified
email recipients, you should disable those destinations.
To run a report package: