Running a Report Package

After you create a report package, you may want to run it to see that it works. On the Package page, you can click the Run Package button to run a selected report package.
Important: When you run a report package manually to test it, you send the output results to all of the destinations that have been enabled in the package. If you do not want the output results to be sent to all of the specified email recipients, you should disable those destinations.

To run a report package:

  1. Click Report Scheduler in the navigation bar.
  2. Select a report package.
  3. Click Run Package.
    A message box opens to confirm you want to run the report package.
  4. Click OK.