A report package will run according to its schedule as long as it is enabled. If you
do not want the report package to run anymore, you can disable it.
To disable or enable
a report package:
Click Report Scheduler in the navigation bar.
Select a report package.
Click Edit Package.
The Edit Package Schedule dialog box opens.
On the Info tab, disable the package by unchecking the
Enabled check box.
Similarly, to enable the package, make sure the Enabled check
box is checked.